• Morning, dubkev here.

    18 panels are going to be delivered to HH today. @punkture is going to take the delivery at HH, the panels are going to be left near one of the shipping containers, wherever there is space.

    Is anyone free tomorrow Sunday for some lifting and rebuilding? I can do 9:30am to 11:30am, might be able to negotiate it until midday.

    First part will involve lifting the panels into the centre track, second bit will involve rebuilding the supports into the new panels and the stanchions, third bit hanging back up the net.

    The panels are 18mm with a black plastic film surface on them, which looks pretty good in terms of waterproofing, I don't think we will have to do much with them. They are recycled from a housing development building site exterior panelling in Woolwich, some of them have text on them, might be something like Barratt Homes.

    If people are free tomorrow to rebuild that would be great. Even if someone is free in the morning to help me lift the new panels into the centre area that would be a good start on the work.

About

Avatar for ms-chris @ms-chris started