You are reading a single comment by @rodabod and its replies. Click here to read the full conversation.
  • It'll be tricky to plaster down to the work top, but not impossible.

    I'd chisel or drill down at an angle as already suggested.

  • Tiling from work-surface up to about a foot above said surface, plasterwork needs to stop around 11" above work-surface, therefore.

About

Avatar for rodabod @rodabod started