I got a multi-cutter, it got through the top layer of plaster, the secondary layer, and then I had to stitch-drill with the SDS and use the bolster+club hammer.
Done now and the hall looks much better - all door frames stripped back, skirting off, ready for the plasterer.
I got a multi-cutter, it got through the top layer of plaster, the secondary layer, and then I had to stitch-drill with the SDS and use the bolster+club hammer.
Done now and the hall looks much better - all door frames stripped back, skirting off, ready for the plasterer.