B never dropped any tools off with me, but I have got a drill with 2 batteries and a hammer from the pub. I also have access to a ladder for the net. I can only do Saturday before 5.
I honestly think that it will not take long to fix it just a case of getting the numbers to lift, 45 minutes at the most. so we will be able to play most of the day if that is an incentive to get people down.
The corner took elliot and myself 15 minutes to fix.
B never dropped any tools off with me, but I have got a drill with 2 batteries and a hammer from the pub. I also have access to a ladder for the net. I can only do Saturday before 5.
I honestly think that it will not take long to fix it just a case of getting the numbers to lift, 45 minutes at the most. so we will be able to play most of the day if that is an incentive to get people down.
The corner took elliot and myself 15 minutes to fix.