Is £2,300 a bit steep for the labour needed to replace the CH system in a 3 bed house with an unvented cylinder & system boiler, install rads upstairs (there aren't any currently), reposition rads downstairs and replace the incoming mains pipe?
Total quote came to just over £5k including parts
Plumber said it'd take about a week.
Is £2,300 a bit steep for the labour needed to replace the CH system in a 3 bed house with an unvented cylinder & system boiler, install rads upstairs (there aren't any currently), reposition rads downstairs and replace the incoming mains pipe?
Total quote came to just over £5k including parts
Plumber said it'd take about a week.