  • Short update.
    I finally got my frame after about 5 months ½ (instead of 8 weeks), and very poor communication. Positive: frame was extremely well packed, and the bike looks quite beautiful (not fully built as yet, I am waiting components). Negative: the left rear dropout was too small to accommodate the wheel axle (9.30 mm, axle 10 mm), so I had to file the drop out to be able to install the wheel. Poor quality control apparently. Will see how the bike behaves when built. By the way they also told me that they moved to another location (hence all the delays), but the photo of the bike they sent me was taken exactly at the same place as all the Pelizzoli frames I have seen on the net for months…