Not much interest in this ? Based on list size, the main group ride on the 6th of July is actually going to be smaller than the small 7VEN-friendly ride on the 29th of June.
Would people prefer a Saturday, or another weekend (19/20 and 26/27 July would also work) or have I killed the big group ride dream by trying to arrange two rides ?
Not much interest in this ? Based on list size, the main group ride on the 6th of July is actually going to be smaller than the small 7VEN-friendly ride on the 29th of June.
Would people prefer a Saturday, or another weekend (19/20 and 26/27 July would also work) or have I killed the big group ride dream by trying to arrange two rides ?